Summer Construction & Repairs In Progress at AE/MS

By Jane Slayton
“The summer allows time for construction and repairs at AEMS. The courtyard walkway is being leveled and re-tarred. The steps to the older section of the building are being repaired. Exterior painting is in progress. An interior stairway is getting new stair treads. Carpets are being cleaned. Tile floors are being stripped and waxed. Additional security cameras are being added. It is a very busy place as we prepare for the return of students after Labor Day.”